Project: SpiritOfMudsuck   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Pete Dailey   -  
Project:   Sonex - Xenos-B Motorglider   -   VIEW REPORTS
Total Hours:1506.3
Total Flight Time:
Total Expense:$75148.03
Start/Last Date:Jul 01, 2016 - No Finish Date
Engine:Aerovee 2.1 Turbo
Propeller:Sensenich
Panel:MGL Avionics Explorer iEFIS/ECB/RDAC
 
Friendly URL: https://eaabuilderslog.org?s=SpiritOfMudsuck

Home or Last Project Picture

Jan 10, 2021     Dimple spoiler mounting bracket holes - (1.5 hours) Category: Controls
Used a AeroConversion dimple die set (male/female and nail) to dimple the horizontal (XNS-C06-04) and vertical (XNS-C06-08) angles. Deburred and dimpled the spar tunnel holes. Needed a second pair of hands to complete the nine horizontal holes.
Tried to fit a Stanley flexible head riveter (for pulled rivets) into the spar tunnel but it would not fit. Contacted Joe and Denise Armstrong, builders of XenosB project https://eaabuilderslog.org/?s=Parms who uploaded several additional photos to 08/16/2018 showing the XNS-C06-05 installation. Examination of the photos indicate solid rivets fastening XNS-C06 -04/-08 to the spar tunnel. Finding a second pair of hands and the right bucking bar will be challenging.
 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.